Duff-norton Machine Screw Translating 2 Ton - 75 Ton Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Matériel Duff-norton Machine Screw Translating 2 Ton - 75 Ton. Duff-Norton Machine Screw Translating 2 Ton - 75 Ton User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 8
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
®
CAUTION
This manual contains important information for the correct installation, operation and maintenance of the
equipment described herein. All persons involved in such installation, operation, and maintenance should be
thoroughly familiar with the contents. To safeguard against the possibility of personal injury or property
damage, follow the recommendations and instructions of this manual and keep it for further reference.
WARNING
The equipment shown in this manual is intended for industrial use only and should not be used to lift, sup-
port, or otherwise transport people.
Publication Part No. SK-2389
Vue de la page 0
1 2 3 4 5 6 7 8

Résumé du contenu

Page 1 - Publication Part No. SK-2389

® CAUTIONThis manual contains important information for the correct installation, operation and maintenance of theequipment described herein. All pe

Page 2 - Contents

2Section IGeneral Information1-1. GeneralThis manual contains maintenance instructionsfor Duff Norton translating machine screw actuatorsof two ton to

Page 3 - Table 3. Decimal Ratios

3Table 2. 4800 and 9400 Series1-4 Important PrecautionsIn order to ensure that Duff-Norton actuatorsprovide good service over a period of years thefol

Page 4 - Maintenance

4tors are designed to be adjusted for minimumbacklash, approximately .002 inch. The wormgear and anti-backlash nut are manufactured tohave a clearance

Page 5 - 2-5. Cleaning

54. Remove gear (6A) or worm gear and nut assem-bly (6B) from shell (3).NoteTo facilitate removal of the gear from the shellon models with 50- ton or

Page 6 - Illustrated Parts List

6as required.7. Install top load bearing (7) or bearing cup onworm gear (6A) or worm gear and nut assembly(6B).8. Fill housing fully with grease.9. In

Page 7

7ABFigure 3-1. Exploded Illustration 1800 (2000), 9000 (10000), 4800 (5800) and 9400 (10400)Series Translating Machine Screw Actuators

Page 8

P.O. Box 7010Charlotte, NC 28241-7010General Office (704) 588-0510Customer Service (800) 477-5002Customer Service (704) 588-4610FAX (704) 588-1994Ema

Commentaires sur ces manuels

Pas de commentaire